
A new Dales Way Information Board has just been installed at Barden Bridge, after the old frame of the previous one finally rotted away.
The new frame was constructed at the National Park’s Maintenance shop in Grassington, fitted with the last of our new Information Boards and installed by National Park rangers. The frame is made of Accoya acetylated wood, sustainably sourced with FSC® certification and it has minimal environmental impact throughout its entire life.
The £675 cost of construction was covered by a donation from the Dales Way Association. This is one of 9 Information boards along the route of the Dales Way.
The boards first appeared in 2004 thanks to hard work by DWA members Margaret and Ken Staines. The sketch drawings are by Patricia Hickman.